 |
| Working Dogs |
|
|
| |
G3 Systems has been awarded a contract by the UK Ministry of Defence Battlefield Infrastructure IPT to supply a deployable kennel system for their working dogs, known as Military Working Dogs (MWD). This was part of an Urgent Operational Requirement.
The deployable infrastructure facility requirement consists of two types of unit: transport containers for tactical movement of MWD in theatre and a rear based housing using an ISO based system.
The transport containers offer a significant advantage compared to the containers currently in service as they are collapsible for storage, allowing a space reduction of over 50%, whilst still allowing storage of ancillary items within the collapsed container, i.e. ratchet straps and doors. The system is also durable and light-weight due to the aluminium construction.
The ISO-based housing system features:
- Fully compliant exercise area and sleeping areas.
- Rugged construction, with sleeping area fully contained within an ISO drops container.
- Flat-packable exercise area.
- Rapid assembly/disassembly.
- Self-contained HVAC system, capable of operation within full range of deployed conditions.
- Electrical connectivity within container.
- Capable of connection and operation from 240V power supply (UK & EU/ROW Standard).
- Designed for easy cleaning, with minimal maintenance and under floor heating
It will be possible to transport the system using vehicles such as the 4T cargo vehicle and Landrover TUM /Snatch 1&2 over land and by air using the C130 Hercules, Puma HC1 and Chinook CH47. A range of carefully selected materials have been used in the design to ensure safety for both the dogs and operators. This also ensures the system is easy to clean and maintain.
Request more information.
|
| Combined Instrument Repair Facilities (CIRF) |
|
|
| |
G3 Systems is delivering 13 Combined Instrument Repair Facilities (CIRF) for the UK MOD (Ministry of Defence) for Workshop Support Services Integrated Project Team (WSS IPT)
Each of the 20’ ISO DROPS Containers are designed for the repair and maintenance of both laser and day and night sights housed in a variety of vehicles such as: Challenger 2; Warrior; Scimitar and the forthcoming FRES range of vehicles.
These 13 units replace a variety of vehicles currently in-service with the MOD and operated by the Royal Electrical Mechanical Engineers (REME).
The workshops are fully air-conditioned and have bespoke Laminar-flow work benches to provide a clean working environment. The DROPS containers house all the equipment needed to service the sights and are designed to be operated whilst truck mounted. A dropdown platform to one side of each truck aids access and allows equipment to be moved into the workspace via the container mounted jib-arm.
All equipment is stowed within the parameters of the ISO frame to allow for easy shipping by land, air and sea.
Request more information.
|
| Medical Treatment Facility |
|
|
| |
G3 Systems were contracted by the 62 Works Group Royal Engineers
from the UK MoD to design and build a Role 2 medical treatment facility within Camp
Bastion in southern Afghanistan. With a minimum life expectancy of 3 years the
system provides a wide variety of services including; primary health care,
trauma resuscitation, life saving damage control surgery, internal medicine,
dentistry and physiotherapy. G3 Systems were supported in the design by
specialist consultants from the London South Bank University Hospital,
Medical Architectural Research Unit.
Request more information.
|
| Entertainments Facility |
|
|
| |
G3 Systems were contracted to build an Entertainments Facility at
Kandahar Airfield (KAF) by the UK MoD. Measuring 60.8 metres long and just over
24 metres wide the double skinned air-conditioned building houses a gymnasium,
sports court, cinema, café and scope to include a bowling alley. A mezzanine floor
and outside leisure area add dimension to the facility which includes toilets, showers
and catering facilities.
Request more information.
|
| Field
Catering Systems |
|
|
| |
G3 Systems, along
with Karcher (UK), have supplied over two thousand tented
field kitchen systems. Using Karcher cook
sets as the basis of the set up the kitchens can be manipulated
to cook for up to 100s of men using the same equipment.
A full Contractor Logistic Support package is also managed
by G3 Systems on these in service units which are deployed across
the globe.
Request more information.
|
| Operational
Laundries |
|
| |
G3 Systems have provided
50 ISO based laundry systems to the UK MoD. A complex system
allows the kit of up to 300
men per day to be laundered in the field. High quality
Miele Professional washers and driers are used along with
a Karcher water heater. An ACU and additional tentage ensures
all year round comfort for operators.
Request more information.
|
| Portable
Field Office |
|
| |
Over 340 tailor made
portable offices are in service with UK forces, housed and
transported on Bedford Trucks. Office
and storage space for 5 men is provided along with one
ACU and the provision for a 2nd if conditions require.
Communications terminals are fitted along with an escape
hatch and black
light.
Request
more information.
|
| Two
Storey Office Complex |
|
| |
Within the grounds
of the Presidential Palace in Kabul, G3 Systems completed
an Urgent Operational Requirement to
build a complex 2 storey office facility, to time and to
budget. The system included office and conference facilities,
kitchens, toilets, showers, recreational rooms, bedroom
suites and all power, water and sewerage. A pitched roof,
drainage and all electrical installations were
carried
out to spec.
Request
more information.
|
| Philips
CT Scanner |
|
| |
At Shaibah log base
in Iraq, G3 Systems installed and now maintain a CT Scanner
with satellite diagnostics, along with the building and all
ancillary equipment and offices. This system has proved to
be of great use to the coalition forces over the last 2 years,
operating in the harshest environments.
G3 Systems also designed and installed an X-ray and operating theatre
as well as an intensive therapy unit at the base.
Request
more information.
|
| Engineering
Workshops |
|
| |
Due in service in 2007 is a complete engineering and workshop
facility designed and constructed by G3 Systems. Housed
in uniquely designed 20 foot ISO containers, the 12 workspaces
and complimentary soft wall shelters provide durable facilities
for engineers and architects to design, build and re-build
infrastructure around the globe.
Request
more information.
|
| Deployable
Head Quarters |
|
| |
G3 Systems have delivered a
deployable tented Head Quarters for the UK MoD which has
built in facilities for handling communication,
IT and data cabling. Rapidly erected and durable, the system
provides a conditioned and comfortable office space for
80 to 175 staff. Configured using proven in service equipment,
the system could be extended as far as space allows to
increase staff capacity.
Request
more information.
|
|
|
|