Combined Instrument Repair Facilities for WSS IPT. Each unit consists of:
- 20’ ISO CSC approved DROPS Container with 2 compartments:
- Compartment 1: Day/Night Sight repair, utilising 50% of the internal container space.
- Compartment 2: Laser repair using CR2 TARP, utilising 50% of the internal container space.
- DAVIT hoist system.
- Container structural steelwork and floor construction.
- Bale bar arrangement.
- Roof access ladder and safety lashing system.
- Container jacking system.
- Container access doors and hatches.
- Electrical interface panel.
- Power Distribution Board.
- Basic electrical installation including lighting & emergency stop provision. Compliant with BS7671.
- 4 man equipment storage locker.
- Under bench racking system.
- Air conditioning system.
- Heating system.
- Platform safety barriers.
|