CONSTRUCTION


Bastion Equipment Sustainability System

G3 Systems designed, supplied and installed internal buildings services and equipment systems to the Equipment Support Facility (ESF) Building and Heavy Repair Facility (HRF) Building at Camp Bastion.
The ESF & HRF Buildings are used for the maintenance, servicing and support of UK Military tracked and wheeled vehicles, providing a total of 20 vehicle bays. The scope of works performed included provision of the following equipment & services:
  • Vehicle Fume Extraction System
  • Weld & Dust Extraction System
  • Fluids Dispensing System
  • Compressed Air System
  • Vehicle Access Doors
  • Vehicle Bays Electrical Supplies
  • Environmental & Temperature Control
  • Industrial Air Curtain
  • Safety Showers & Eye Washes
  • Specific Fixture & Fittings – Equipments
  • Workshop & Office Fixtures & Fittings
  • Electrical Systems - ESF & HRF
  • Mechanical Systems - ESF & HRF
G3 Systems was also contracted to provide 6 months spares and maintenance support to the above systems.
 

BACK TO MENU

 
... since 1997
 
                                            © 2011 G3 Systems Limited. A Subsidiary of IAP Worldwide Services, Inc. All rights reserved. Privacy Policy