G3 Systems designed and built two buildings and a test area as part of an upgrade to the Equipment Support Facility in Camp Bastion to meet the current and increasing vehicle support & repair requirement. The scope of works included design and supply of the following:
  • Site preparation, fencing, excavation & underground services
  • Construction of 2 x industrial type buildings (FRP Building: 4320m2; EEA Building: 1835.5m2) for use as storage, workshops, meeting rooms and offices. Buildings comprise a mixture of reinforced concrete construction and steel portal frame techniques, with integral force protection measures.
  • Provide & commission internal electrical distribution
  • Provide & commission water and sewerage distribution. General site service requirements for Emergency Water Supplies (EWS) for firefighting purposes and domestic non-potable water supplies
  • Non Potable Water - radial water supply main for each building from a main tank in a centralised storage area
  • EWS Systems consists of GRP tanks, integral pipework, pressurisation pumps, controls & hydrants
  • Construct toilet block facilities
  • External lighting
  • Towing cable Test Facility including groundworks and electrical distribution
 